How to export and read a project time report
Use WorkComposer’s Project Report to review time by project and person. Open an individual project for a task-level breakdown, then check that the CSV covers the time and people you expect.
Choose the right export
In WorkComposer, open Time Tracking → Project Tracking. On the Task Report page, set the date range and check the report time zone before exporting. Under Group By, choose Days, Weeks or Months. Each group is a reporting period. The last weekly or monthly period can extend past the selected end date. Use the same time zone when comparing the CSV with another record.
Export Project Report
Choose this on the project list to review tracked time by project and person across the projects in your report scope.
CSV columns
Date, project, user, duration
Export Task Report
Open the project, then choose this export to review tracked time by task and person within that project.
CSV columns
Date, project, task, user, duration
Both exports use the people your account is allowed to report on. Confirm that scope if you expect hours for a whole team.
Read the task report CSV
Illustrative export for one project on November 9, 2026.
Scroll sideways to see the duration column.
"date","project","task","user","duration"
"9.11.2026","Site Refresh","Review drafts","Avery Lane","01:30:00"
"9.11.2026","","","Robin Vale","00:45:00"
"9.11.2026","","Check redirects","Avery Lane","00:25:30"- WorkComposer prints the project and task labels on the first row of their groups. The second row still belongs to Site Refresh and Review drafts. The third row starts the Check redirects task within Site Refresh.
- The date is printed on each row. In a copy of the CSV, fill the repeated labels down within each reporting period before sorting or filtering.
- Duration is elapsed hours, minutes and seconds. A duration of
01:30:00is 1 hour and 30 minutes. Import the duration as elapsed time and convert it to decimal hours only if your spreadsheet or billing process needs that format.
Check what the export covers
The Project Report can include up to 100 project-and-user rows per reporting period. The Task Report can include up to 100 rows per reporting period, grouped by project, sprint, task and user. If there are more groups, the export keeps the 100 with the most tracked time.
Review row counts by period. If a period reaches 100 rows, check for missing people or tasks. Group by a smaller period to check a crowded export in more detail. A shorter date range makes the file easier to review. An export can process up to 2,000 periods, so check the first and last dates for long ranges.
Before relying on totals for billing or a client update, compare them with your reviewed time records for the same project, people, dates and time zone. Check entries near a reporting period boundary and resolve any differences before using the totals.